
Project journal / Pacific Palisades
Pacific Palisades.
Framed in steel.
The house burned in the January 2025 Palisades Fire and is being rebuilt in steel. These photos show the light-gauge steel frame APB built for it, from numbered wall panels to the complete roof frame. No renderings in the photo essay.
- Burned January 2025 · rebuilding in steel
- Pacific Palisades · City of Los Angeles
- Panelized light-gauge steel
- 15 site photos
CSLB #951030 · first issued 2010 · verify on cslb.ca.gov (opens in a new tab)
From the fire to a steel frame.
- January 2025
- The house burned in the Palisades Fire. It is being rebuilt with a light-gauge steel frame.
- The plans
- Steel framing starts on paper. A California-licensed engineer stamps the structural drawings and calculations. APB coordinates the engineering: we're the framing contractor, not an engineering firm. Wall panels are built off site to the shop drawings and arrive numbered.
- The steel frame
- Numbered panels stand on the slab, braced plumb, and the roof framing follows. Every stud, track and rafter in these photos is galvanized steel.

3D illustration of a burnt lot, not a photograph of this house





Watch it rise
Slab to roof line.
- Panels arrive
- Walls stand
- Rooms take shape
- Roof framing goes on
- Frame complete
From numbered panels to a finished steel frame.
How a steel-framed house goes up, in the order it happens on site. The photographs on this page are from the job, graded but never retouched.
The plans, built
Panels arrive
Walls are built as panels before they reach the site, and every panel carries a number that matches the shop drawings. The crew sets them in order instead of cutting studs on the lot.
Walls
Walls stand
Each panel is stood up on its line on the slab and held plumb with temporary wood braces until the walls and roof tie together. Door and window openings come framed in the panel.
Roof
Roof goes on
Open-web steel roof members span the rooms and a ladder-built steel overhang forms the eave. Materials go up by telehandler and crane.
G90 and the marks
Details that matter
Studs and joists come pre-punched, so plumbing and wiring pass through without cutting the frame. Connections are screwed steel to steel, and the members are galvanized against corrosion.
The frame
Frame complete
Steel rafters now run the full length of the house, and every wall and opening is in place. The structure is ready for sheathing, the roof deck and the trades that follow.

Read the frame.
Six things a light-gauge steel frame tells you, on a photo from this site. Tap a number.


Every photograph from the job.
15 frames, from the first panel on the slab to the roof line. Drag, swipe or use the arrows.















01 / 15
Building in the Palisades? Your plans can go up the same way.
Pacific Palisades is in the City of Los Angeles, so LADBS issues the permit. If your plans are drawn for wood, we convert them to engineered steel and frame the house.
Your plans can go up the same way.
Send your wood-frame plans and your address, or start without plans. We review what a light-gauge steel frame involves for your home and tell you what changes.
Check your address first: fire zone, fire perimeter and who issues your permit

